Documents‎ > ‎

Reports and Contracts


SelectionFile type iconFile nameDescriptionSizeRevisionTimeUser
ċ

View
Bozeman study on sewer rates/charges.  May 4, 2011, 12:32 PM The Administrator
ċ

View
Report to the Gallatin County Planning Board on the feasibility of regional wastewater solutions. This document contains the text. (20Mb download)  Sep 6, 2010, 4:37 PM The Administrator
ċ

View
Report to the Gallatin County Planning Board on the feasibility of regional wastewater solutions. This document contains the figures. (28Mb download)  Sep 6, 2010, 4:40 PM The Administrator
ċ

View
Report assessing the environmental impacts of various wastewater treatment options for the District. (37Mb download)  Sep 3, 2011, 1:12 PM The Administrator
ċ

View
Report to the District on various options for collecting and treating wastewater along with a recommended solution. (45Mb download)  Sep 6, 2010, 4:47 PM The Administrator
ċ

View
Appendices to a report to the District on various options for collecting and treating wastewater along with a recommended solution. (38Mb download)  Aug 15, 2011, 4:03 PM The Administrator
ċ

View
Report to the Gallatin County Planning Board on the feasibility of regional wastewater solutions. This document contains the text. (32Mb download)  Sep 3, 2011, 3:41 PM The Administrator
ċ

View
Appendices to report to the Gallatin County Planning Board on the feasibility of regional wastewater solutions. This document contains the text. (18Mb download)  Sep 3, 2011, 3:46 PM The Administrator
ċ

View
Report by independent engineer assessing the environmental impacts of the proposed project.  Sep 9, 2015, 9:08 AM The Administrator
ċ

View
Amendment to the 2010 PER  Apr 12, 2016, 7:10 PM The Administrator
Ċ
View Download
  6397k v. 1 Mar 31, 2016, 5:24 PM The Administrator
ċ

View
Design report to MDEQ describing the proposed system design for the District's wastewater project.  Apr 18, 2016, 4:07 PM The Administrator
Comments